Just as the Olympics finished up so did the Ravellenic Games (rav link) over on Ravelry. I'm happy to report that I picked up eight medals during the games.
Looking forward to the 2014 Olympic Games in Sochi!
Showing posts with label ravellenicgames2012. Show all posts
Showing posts with label ravellenicgames2012. Show all posts
Monday, August 13, 2012
Monday, August 6, 2012
Weaving is addictive
Yesterday was a luxury - an entire day to myself without work, laundry, or errands to run. I thought about jetting off to London for or cross country to see friends, but it was necessary to be at work at 8am on Monday. Instead, I got up, made a pot of tea, and baked a batch of fresh scones. I had the entire day to myself to do whatever I wanted!
And I did.
A box of yarn arrived the day before from The Loopy Ewe that included some additional back up skeins for the Sky scarf (more on that this week) and two skeins of Handmaiden's Casbah sock in the Pansy colorway. They were destined to be a woven scarf for holiday gift giving that I wanted done early. (I am determined to get more of my holiday gift giving done earlier this year!) Since I had the entire day to myself, I figured I would wind the yarn and get it warped onto the loom.
I got it warped and then it was time for a lunch break. After eating, I popped in Season 2 of Downton Abbey, and figured that since I had the time, I'd weave for a while I watched an episode or two. Before I knew it I had to put disc 2 in and then I was about two-thirds of the way done.
Weaving is quite rhymic so I changed to disc 3 and wrapped up the scarf. It came off of the loom the same day it went on and it looks fabulous. The green turned out to be a little more lime than I expected, but it pops and it helps to break up the blues and the purple. Coming off the loom it measured 8" wide by 68" long without fringe (76" with) and I ended up using 136 grams of the sock yarn with translates to 418 yards total.
Going to play catch up on the Sky Scarf (Ravellenic Games distracted me!) and then back to the Shaelyn shawl. And because I can't resist close ups of woven scarves on the loom, I'll leave you with this:
PS - The whole day was lovely!
And I did.
A box of yarn arrived the day before from The Loopy Ewe that included some additional back up skeins for the Sky scarf (more on that this week) and two skeins of Handmaiden's Casbah sock in the Pansy colorway. They were destined to be a woven scarf for holiday gift giving that I wanted done early. (I am determined to get more of my holiday gift giving done earlier this year!) Since I had the entire day to myself, I figured I would wind the yarn and get it warped onto the loom.
I got it warped and then it was time for a lunch break. After eating, I popped in Season 2 of Downton Abbey, and figured that since I had the time, I'd weave for a while I watched an episode or two. Before I knew it I had to put disc 2 in and then I was about two-thirds of the way done.
Weaving is quite rhymic so I changed to disc 3 and wrapped up the scarf. It came off of the loom the same day it went on and it looks fabulous. The green turned out to be a little more lime than I expected, but it pops and it helps to break up the blues and the purple. Coming off the loom it measured 8" wide by 68" long without fringe (76" with) and I ended up using 136 grams of the sock yarn with translates to 418 yards total.
Going to play catch up on the Sky Scarf (Ravellenic Games distracted me!) and then back to the Shaelyn shawl. And because I can't resist close ups of woven scarves on the loom, I'll leave you with this:
PS - The whole day was lovely!
Tiny socks
Finished the baby socks to match the hat that I finished last week. They only used 14 grams of yarn and fit in the palm of my hand. They will be dropped in the mail this week and off to my cousin's family. Another Ravellenic Games project completed!
Friday, August 3, 2012
First Circular Sock Machine Knit
I had been invited to a friend's house to try knitting on a circular sock machine and took her up on the offer. It was something I was interested in and had no opportunity to try before, since most of the machines out there are antiques. We began with some basic instruction and discussion of the machine parts and how it works. For my first project, she recommended a tube scarf because it would give me the feel of the machine and how it cranks.
A gem of a skein of Wollmeise 100% (Pfauenauge colorway) had been tucked away in my for years because I had not found the right project for it. We talked and I knew I was going to need to some series yardage if the scarf was to be long enough to comfortably wear, and everything fell into place. I think it took about an hour or so to create and I finished the ends later that night.
First, I was amazed at the speed of the machine and how efficiently it worked. If you were a woman at the end of the twentieth century and had one of these machines available to you, you could easily create socks, mittens, scarves, and more for your family and still have time available for other demands.
Second, the machines and process are quite technical. There are a million variations (yarn weight, tension, number of stitches, ribbing, spacing between stitches, weights) that are thrown into the mix. It reminded me of working with the loom - since there are a lot of decisions that are made as you set up the project and as you begin. Unlike knitting however, you can't make too many modifications as you move through the project. Once you're set, you're set. The end on the right is a tad looser gauge than the one of the left, because we were adjusting and getting tension set. I really enjoyed the project and I'm interested in learning a bit more. We set a date to try for a pair of socks later this month!
PS - This is counting toward my personal sock club project for the month!
Tuesday, July 31, 2012
First project across the finish line...

I finished the baby hat decreases last night and blocked it out. Definitely a good project for using up leftover sock yarn because it only took 17 grams of fingering weight yarn. The pattern came from the Sock Yarn One Skein Wonders book and it is the Shibui Baby Hat and Socks (rav link). It helped me complete the Hat Dash and Baby Dressage events for the Ravellenic Games. I'm onto the socks now. After knitting adult size ones for years, these are a breeze!
I thought I would check in on my 2012 knit/crochet/weaving goals. I've made a bit more progress, but I'm still halfway to the yardage goal of 12,000 yards in 2012. As of today, it stands at 5,546 yards completed and 6,454 yards remaining. I think I might need to weave a few things....
Monday, July 30, 2012
Ravellenic Games knitting begins
I've started off the Ravellenic Games with a couple of small projects - a baby hat and socks. This will enter me in a hat dash and sock put as well as baby dressage and single skein.
I hope to finish up the hat tonight. And the socks - they are so tiny! The ribbing for the leg portion currently fits around my thumb. And hey, they should go quickly!
I hope to finish up the hat tonight. And the socks - they are so tiny! The ribbing for the leg portion currently fits around my thumb. And hey, they should go quickly!
Friday, July 27, 2012
Ravellenic Games start today!
To coincide with the Olypmics in London, Ravelry is hosting the Ravellenic Games. I'm starting my first project tonight!
Subscribe to:
Posts (Atom)









